|
|
 |
- Preparation of preliminary engineering reports etc & topographical survey work for phase II for dedicated multimodal high axle load freight corridor on Delhi- Hawrah route between Sarabhopat (incl) to Chamrok (excl). Approximate length 105 km (Eastern corridor).
(Client : RITES- Delhi).
- (a) Preparation of preliminary engineering reports etc & topographical survey workfor phase II for dedicated multimodal high axle load freight corridor on Delhi-Mumbai route between Sirohi ( incl) to Bhinwala. Approximate length 210 km sector 10 (Western corridor).
(Client : RITES- Delhi).
(b) Preparation of preliminary engineering reports etc & topographical survey work for phase II for dedicated multi modal high axle load freight corridor on Delhi-Mumbai route between Sirohi ( incl) to Bhinwala. Approximate length 210 km sector 10
(Western corridor).(Client : RITES- Delhi).
- Preparation of preliminary engineering reports etc & topographical survey work for phase II for dedicated multimodal high axle load freight corridor with computerised control systemon Mumbai - Delhi route (Western corridor) from JNPT to Dadri via Ahmedabad, palanpur and Tughlakabad.
- Railway siding work for Tata Chemicals Limited, Panoli.
|
| More Info »» |
|
|