| Assignment Name |
Name of Client |
Brief Scope of Work |
| BBD Test land acquisition survey and topographical survey using total station for four lanning of existing road from Karaswada junction ( NH-17) to
Khandepar (NH-4A) in Goa length 80
km. |
Stup Consultants Pvt. Ltd |
Topographical survey, land acqusition, BBD test and preparation of drawing an report. |
| Preparation of total survey report for 102 km state highway under Uttranchal road improvement programme. |
CES (I)P. Ltd. Delhi |
GPS, topographical survey investigation, inventory study and praparation of survey report. |
| Detail survey using total station for construction of Himalayan highways in Uttranchal Mussarrrie - Dhanauti-Chamba- New Tehri-Melatha road for 145 km. |
SMEC Delhi |
GPS, topographical survey investigation, inventory study and praparation of survey report. |
| 4 Lanning and strengthening of NH-57, Jhanjharpur- Darbhanga station, in the state of Bihar, India- C- II/Br -7, Package (Length 40 km) |
Madhucon Project Ltd. |
GPS, topographical survey investigation, inventory study and praparation of drawing and survey report |
| Topographical survey for state highway (SH-04) from Ullasganj-Daniwa at Nalanda Bihar.(Length-43 km) |
CES (India) Pvt.Ltd Delhi |
Topographical survey, pillar fixing, traversing, investigation, inventory study preparation of drawing. |
| Preparation of DPR and topographical survey for construction of roads, on BOT basis in Punjab ( Hoshiyarpur - Phagwana & Sirhind - Morinda - Ropar road) |
SMEC Delhi |
Topographical survey,traversing,pillar fixing detail of structures, preparation of detail ptoject report. |
| Detailed Project Report for rular road of Chhattisgarh (Topographical Survey) (Length App.350 Km.) |
CES (India) JagdalpurPvt.Ltd |
GPS, Topographic traffic survey, investigation, land plan, deflection test, roughness test, inventory study and preparation of survey report’s |
| Preparation of total survey report for four (Begusarai-Khagaria) of NH-31, package No. NN/DL3/5 under NON-NHDP program of BOT project under NHAI. |
Craphts Faridabad |
GPS, Topographic traffic survey, investigation, land plan, deflection test, roughness test, inventory study and preparation of survey report. |
| Detail survey using total station for construction of link road from Lodhrani-Kuda to BP 993(International Boundary)36 km. Kuda to BP 993(International Boundary)36 |
Stup Mumbai |
GPS survey, Topographic survey, investigation, inventory study and preparation of survey report. |
| Detailed Survey using total Station for six/four lanning of Km 198 to 263 Bharuch to Surat section of NH-8 in Gujrat. to Surat section of NH-8 in Gujrat. |
Stup Mumbai |
Topographical Survey, Investigation, Inventory study, preparation of drawing and survey Report. |